realized projects
-
Residential town "ARTVILLE" at the address: Ovidiopol district of SMT Avangard, block 10, plot 198/1, 198/2, 199/1, 199/2
-
An industrial and laboratory building for "Operator of the GTS of Ukraine", LLC at the address: Kiev, Lubomir Guzar avenue, 44
-
Office premises at the address Institutskaya st., 18/110 Kyiv
-
Lipinka residential complex on Zamkovetskaya st. in Podolsky district of Kyiv
-
The building of the Kiev printing house "PRIME-PRINT" at the address: Kiev region, Kiev-Svyatoshinsky district, Tarasovka village, st. Knyagini Olgi, 1-A
-
Residential complex "Autograph": st. General Zhmachenko, 28, Dnieper district, Kiev
-
An autonomous gas boiler room with a total capacity of 15.9 MW for heating the Park Avenue VIP residential complex at ave. Goloseevsky, 58-A in the Goloseevsky district in Kiev
-
Overhaul of the boiler room and heating networks of a separate unit of the National University of Life and Environmental Sciences of Ukraine
"Nemeshaev Agricultural College"
-
Gasification of boilers for heat supply of technical building No. 1, technical building No. 2, engineering-laboratory building, workshop building in Sasiv village, Zolochiv district, Lviv region
Cosmos is a National Center for Management and Testing of Space Resources - 4 furnaces (gas boiler rooms), external pipeline.
-
The production base of the construction and installation company "Ukrgazpromstroy" in Poltava, st. Kovalevskaya, 9
-
Bakhmut psycho-neurological boarding school, Donetsk region, Bakhmut district, village Veselaya Dolyna, st. Zelenaya, 7
-
Residential complex "Seven" on the st. 18 Dnieper embankment in the Darnitsky district of Kiev
-
Residential complex "Metropolia" on the st. Kamenskaya, 130, 130a in Darnytskyi district of Kiev
Individual heat point with a heat load of 1,000 Gcal / h.
-
“Talne” compressor station of "Soyuz" gas pipeline.
Autonomous gas boiler room with a total capacity of 2920 kW, the external pipeline from gas distribution points and cabinet-type gas metering unit, external power supply network.
-
“Oleksandrivka” compressor station of "Soyuz" gas pipeline
Autonomous boiler with total capacity of 2200 kW, the external pipeline from gas distribution points and cabinet-type gas metering unit, external power supply network.
-
The medical-diagnostic complex of the National Children's Specialized Hospital "Ohmatdit"
Independent gas boiler with a total capacity of 7500 kW, an external gas pipeline with a gas distribution cabinet and a gas metering unit.
-
‘AVON Cosmetics Ukraine’ SE
Reconstruction of gas boiler-house
-
House Building factory No4
Residential Complex, Trutenko Str., Kiev (5 sections)
-
Kyivshchyna zhytlo’ Residential Complex, Ukrainka town
Built-in gas boiler-house, the total thermal power 1440 kW
-
‘Cherkassytransgaz’ of PJSC ‘Ukrtransgaz’, CS ‘Mashevka’
Modular transportable container gas boiler-house, the total power 3040 kW
-
‘Ukrtelecom’ JSC, ATS 65/66, Cherkassy
Individual heating unit, the total thermal power 440 kW
-
‘Lvovtransgaz’ of ‘Uktransgaz’ JSC, Uhersko village
Modular transportable container gas boiler-houses (5 pcs) , the total thermal power 3705 kW
-
‘KSM-Group', LLC
Ventilation air-conditioning and smoke removal systems
-
‘Kyivshchyna zhytlo’ Residential Complex, Kozyn village
Built-in solid-fuel boiler-house, the total thermal power 200 kW
-
Municipal hospital, Znamenka town
Automatic solid-fuel boiler-house on wood pellets, the total thermal power 1,5 mW
-
Stadium "Donbass Arena"
Infrared heating of Stadium tribunes. The total thermal power - 20.2 mW
-
Track maintenance train of Odessa railroad
Solid-fuel boiler house with coal power-fed
The total thermal power 1 mW
-
"European-Kalyninsky"
Roof gas boiler-house. The total thermal power 2.1 mW
-
Club House "Imperial"
Roof gas boiler-house. The total thermal power 1,9 mW
-
Fort Knox Entertainment Complex
Built-in gas boiler house. The total thermal power - 620 kW
-
Hotel "Europe"
Roog gas boiler-house. The total thermal power - 2 mW
-
Business Center "Modern Dream"
Roof top gas boiler-house. The total thermal power 2,1 mW
-
"Lugansk Electric Machine Building Factory" ltd
Workshops gas infrared heating
-
JSC "Donetskgormash"
Workshops gas infrared heating
-
Donetsk Chamber of Commerce
Roof gas boiler-house. The total thermal power - 786 kW
-
"Dzerzhinsky phenol plant" Ltd.
Modular gas boiler house "Thermomodule". The total thermal power 260 kW
-
"Altcom-Beton-Stroy" ltd
Steam diesel boiler. The total thermal power - 700 kW
-
"Kerch Concrete Plant" Ltd.
Modular gas boiler houses "Thermomodule". The total thermal power 1,26 MW
-
Residential Complex
Roof gas boiler-house. The total thermal power - 3 mW
-
Poultry Company "Feonis"
Built-in gas boiler houses. The total thermal power - 450 kW
-
School, Kindergarten
Free-standing gas boiler house. The total thermal power of 500 kW
-
Central District Hospital in t.Mariynka
Free-standing gas boiler house. The total thermal power - 2.7 mW.
-
Poultry Company "Landgut Broiler"
Free-standing gas boiler house. The total thermal power 2,7 mW
-
Administration office
The central coal boiler house. The total thermal power 1.6 mW
-
CJSC "Centravis Production Ukraine"
Workshops gas infrared heating
-
JSC "AZOСM"
Workshops gas infrared heating
-
"Energomashspetsstal" c. Kramatorsk
Workshops gas infrared heating
-
PJSC "Donetskgormash"
Build-in gas boiler house. The total thermal power - 700 kW.
-
ODO "Trade House Vesta""
Free-standing gas boiler house. The total thermal power - 2.7 mW.